Design and Build of the 438 MLD Wawa Water Treatment Plant

Manila Water Company, Inc. intends to prequalify contractors for the Design, and Build of the 438 MLD Wawa Water Treatment Plant [“Works”] in Sitio Apia, Brgy. Calawis, Antipolo City.

The Project when completed shall be capable of treating raw water with a product water quality that is in full compliance with the Philippines National Standards for Drinking Water of 2017 and the Employer treated water quality output requirements and serve the client network for Antipolo and neighboring municipalities.

It is expected that invitations to bid will be in the first quarter of 2022.

Interested eligible bidders may obtain further information, and inspect the prequalification documents, transmittal of an email, or letter of intent to apply (LOI) to the address below. The LOI will be accepted on or before 26 November 2021.

Applications for prequalification should be submitted in portable document format (PDF) and should be emailed to the designated the Employer email.
Manila Water Company, Inc.
Attention: Alfonso Miguel U. Dela Torre
MWSS Administrative Building, 489 Katipunan Road, Balara,
1105 Quezon City, Philippines,
Tel: +63 2 9175911 local 3006
Email: [email protected]
Cc: [email protected]

November 26, 2021 active Download LOI Express Interest
Invitation for Prequalification: Framework Contract for San Mateo-Rodriguez Sewer Network System

The Manila Water Company, Inc. (MWCI) invites Applicants to participate in the Prequalification for the Framework Contract for San Mateo-Rodriguez Sewer Network System. This project is composed of sewer contract packages that involves a combination of gravity sewers pipelaying thru open cut and trenchless methodology, and construction of interceptor boxes, channel interceptors, and sewer manholes. The Works include the supply, construction, installation, testing and commissioning of a complete and fully functional and operational sewer network system. Interested Applicants may submit a Letter of Intent (LOI) to participate and may obtain further information to the email address below. A complete set of Prequalification Document shall be issued upon acceptance of the LOI. The LOI shall be submitted in portable document format (PDF) via e-mail on or before 16 December 2021.

December 23, 2021 active Download LOI Express Interest
Design and Build Wawa Water Supply System Treated Water Transmission Line - Tunnel Works

Manila Water Company, Inc. intends to prequalify contractors for the Design and Build of the Wawa Water Supply System Treated Water Transmission Line – Tunnel Works [“Works”] from Calawis to Boso-Boso Area.

The Project when completed shall be capable of transmitting water from the Water Treatment Plant (WTP) located at Calawis going to Boso-Boso Area to serve the network for Antipolo and neighboring municipalities.

It is expected that invitations to bid will be in the first quarter of 2022.

Interested eligible bidders may obtain further information, and inspect the prequalification documents, transmittal of an email, or letter of intent to apply (LOI) to the address below. The letter will be accepted on or before 27 December 2021.

Applications for prequalification should be submitted in portable document format (PDF) and should be emailed to the designated Employer email.

Manila Water Company, Inc.
Attention: Alfonso Miguel U. Dela Torre
MWSS Administrative Building, 489 Katipunan Road, Balara,
1105 Quezon City, Philippines,
Tel: +63 2 9175911 local 3006
Email: [email protected]
Cc: [email protected]
Web site: www.manilawater.com

 

 

December 27, 2021 active Download LOI Express Interest