Procurement Notices

CSS DO NOT ERASE


Procurement


Project Title Nature of the Project Mode of Procurement Deadline Status Letter of Intent Template Interested?
Invitation to Vendors: Vendor Reliability Pool (Type D1)

INVITATION TO VENDORS

Manila Water is now accepting VENDOR APPLICATION FOR ACCREDITATION for our Various Facility Rehabilitation Works:

A. Electromechanical Works
B. Electromechanical Works and Minor Civil Works (General Contractor)
C. Civil Works
D. System Integration and Automation

Interested vendors may submit Letter of Intent (LOI) to [email protected], cc: [email protected] with the following details:

SUBJECT: Letter of Intent - Accreditation for Various Facility Rehabilitation Works

ATTENTION: Ms. Jennifer G. Doctor (Head, Category Management Construction, MRO, and Capital Equipment)

March 31, 2024 inactive Download LOI Express Interest
Invitation for Prequalification: Design and Supply of the two Tunnel Boring Machines for the Long-Term East – Phase 1 (LTE 1) Project

Project Name: Design and Supply of the two Tunnel Boring Machines for the Long-Term East – Phase 1 (LTE 1) Project
Contract Title: TBMs for LTE Phase 1 

Manila Water Company, Inc. (MWCI) invites interested applicants to participate in the Prequalification for the Design and Supply of the two Tunnel Boring Machines for the Long-Term East – Phase 1 (LTE 1) Project scheduled on 13 August 2024. 
This invitation is open to all qualified TBM Suppliers which possess the necessary technical experience and capability to deliver different types of Tunnel Boring Machines. The works under this Supply Contract shall be for the design, construction and supply of two small diameter TBMs including their Back Up, spare parts and Site Assistance. 

Contract

TBM Size

Location

TBM for LTE Phase 1

Approx.. 3.0 m ID

Metro Manila

Cainta and Pasig

 

A Prequalification Conference is set on August 7, interested bidders may obtain further information and secure the Prequalification Documents by sending a Letter of Intent (LOI) via email to the address below no later than 06 August 2024.

Applications for prequalification should be submitted in portable document format (PDF) and should be emailed to the designated Manila Water email.

Manila Water Company, Inc.
MWSS Administrative Building, 489 Katipunan Road,
Balara, Quezon City 1105, Philippines
Website: www.manilawater.com

Attention: Alfonso Miguel U. dela Torre
East Zone Procurement Head
E-mail: [email protected]
cc: [email protected] ; [email protected]

 

JHOANA R. TAMAYOR 
Group Director
Corporate Procurement Group

 

 

August 06, 2024 active Download LOI Express Interest
Design and Build of the Tunnels 1B and 1C for the Long-Term East – Phase 1 (LTE1) Project

INVITATION FOR PREQUALIFICATION

Contract name: LTE1 Project – Tunnels 1B and 1C
Manila Water Company, Inc. (MWCI) invites interested applicants to participate in the prequalification for the Design and Build of the two 7.5 km Tunnels (named Tunnel 1B and Tunnel 1C) for the Long-Term East – Phase 1 (LTE1) Project scheduled for October 23, 2024.

This invitation is open to all local and international Contractors which possess the necessary technical experience and capability to:

  • Design and construct the necessary structures to allow launching and retrieving two 3.7 m diameter TBM
  • Design and fabricate the precast tunnel lining to be installed contemporarily to the Tunnels excavation
  • Safely and efficiently operate and maintain two TBM supplied by MWCI.
  • Design and construct other minor ancillary works foreseen under the LTE1 project’s scope

Interested applicants shall submit Letter of Intent (LOI) and may obtain further information to the E-mail addresses below. Complete set of Prequalification Documents shall be issued upon receipt of LOI.

The LOI shall be submitted in portable document format (PDF) via e-mail on or before 18 OCT. 2024 (12 Noon – Philippine Time)

Manila Water Company, Inc.
MWSS Administrative Building, 489 Katipunan Road,
Balara, Quezon City 1105, Philippines
Website: www.manilawater.com
Attention: Alfonso Miguel U. Dela Torre
Head of East Zone Procurement, MWCI Corporate Procurement
E-mail: [email protected]
Cc: [email protected] Cc: [email protected]

 

JHOANA R. TAMAYOR
Group Director
Corporate Procurement Group

 

 

 

October 18, 2024 active Download LOI Express Interest